• Bram-Cor Pharmaceutical Processing and Filling - Turnkey Projects
  • Bram-Cor Pharmaceutical Technologies - Water Treatment Equipment - Site installation
  • Bram-Cor Pharmaceutical Technologies - Water Treatment Equipment - Site installation
  • Bram-Cor Pharmaceutical Technologies - Water Treatment Equipment - Site installation
  • Bram-Cor Pharmaceutical Equipment and Technologies - Site installation
  • Bram-Cor Pharmaceutical Equipment and Technologies - Site installation
  • Bram-Cor Pharmaceutical Equipment and Technologies - Site installation
  • Bram-Cor Pharmaceutical Equipment and Technologies - Site installation - Pickling and Passivation
  • Bram-Cor Pharmaceutical Equipment - Water Treatment Systems - SAT
  • Bram-Cor Pharmaceutical Equipment and Technologies - Site installation - Pickling and Passivation
  • Bram-Cor Pharmaceutical Technologies - Water Treatment System - Site installation
  • Bram-Cor Pharmaceutical Equipment and Technologies - Site installation
  • Bram-Cor Pharmaceutical Equipment and Technologies - Site installation
  • Bram-Cor Pharmaceutical Equipment and Technologies - Site installation
  • Bram-Cor Pharmaceutical Equipment and Technologies - Site installation
  • Bram-Cor Pharmaceutical Equipment and Technologies - Site installation
  • Bram-Cor Pharmaceutical Equipment and Technologies - Site installation

Professional Installation

Professionalism in installation is a basic requirement in all pharmaceutical technologies. We provide installation teams composed of qualified supervisors, patented welders and skilled piping assemblers working in accordance to BRAM-COR sanitary piping procedures all over the world.

 

 

BRAM-COR water treatment equipments are thus integrated to state-of-the-art, GMP-compliant distribution systems, which are inspected during construction, passivated and tested. Isometric drawings of the “as built” loops are supplied as part of the loop documentation, together with the relevant material certificates.